Durham Region & beyondCall or text (289) 928-5689

Home Renovations in Ajax, ON

Room by room, done right.

Lots of Ajax houses are due for their first real update. The bathrooms still have the original vanity and tub surround, the kitchen has builder cabinets, and the light fixtures haven't changed since closing day. We take on home renovations in Ajax at a mid-sized scale, such as bathroom remodels, kitchen refreshes and basement rooms. Pedro has 16 years in construction and can manage every stage of the work himself.

First Real Updates for Ajax Builder Homes

Bathrooms usually come first. A builder bathroom from the 1990s or 2000s tends to have a laminate vanity, a fibreglass or acrylic tub surround and a single light over the mirror. A cosmetic refresh with a new vanity, new fixtures, better lighting, paint and fresh caulking usually takes 3 to 5 days. A full gut and rebuild takes 1 to 2 weeks. In Ontario, bathroom renovations typically run $5,000 to $15,000 depending on scope.

Kitchens in these houses often have a sound layout and tired finishes. Painting the cabinets and adding new counters, a backsplash and new fixtures can make the room feel current without moving a single wall, and that kind of update usually costs $5,000 to $12,000. If the layout itself is the problem, a full kitchen renovation starts around $15,000.

Rental owners in Ajax use us for improvement projects as well, usually timed for the gap between tenants. A bathroom refresh, new flooring in the bedrooms or a fully repainted unit is far easier to do while the place is empty. The written estimate includes a timeline, so you can plan the listing date around it. If the unit needs repairs as well as upgrades, we fold both into one schedule so the place only sits empty once.

Pedro handles bathroom remodels, kitchen refreshes and room renovations. For how he approaches home renovations in general, see our home remodeling & renovation page.

How home renovations works

  1. Ideas and scope

    Tell us what you want to change. We come see the space, talk through ideas and pin down the scope of work.

  2. Detailed proposal

    You get a written estimate that covers each phase: demo, construction, materials, finishes and timeline.

  3. The build

    We go stage by stage. You get daily progress updates, a clean worksite, and nobody disappearing on you halfway through.

  4. Completion and punch list

    We walk through the finished space with you and catch anything that still needs adjusting.

Home Renovations cost in Ajax

In Ontario, bathroom renovations typically run $5,000 to $15,000, depending on scope.

Kitchen updates such as new counters, cabinet painting, a backsplash and new fixtures cost $5,000 to $12,000.

A full kitchen renovation that changes the layout starts around $15,000.

Basement finishing starts around $20 to $40 per square foot, depending on the level of finish.

Every job gets a free written estimate first, so the price is settled before work starts.

What clients say

Read all reviews →
“Pedro did a great job of looking after all the items that needed to be done to finalize our clients project.”
Mooi Interior DesignOctober 2024 · Commercial finishing
“Awesome work and great service. We have used Pedro's services for several projects now. Highly recommended and referrable.”
Ross LibbeyOctober 2024 · Multiple projects

Home Renovations in Ajax: FAQ

Do you offer home renovations in Ajax?

Yes. Ajax is part of our Durham Region service area, and we work there from our base in Bowmanville. Call or text (289) 928-5689, or request a free estimate online.

Can you replace the tub in our Ajax main bathroom with a walk-in shower?

Usually, yes. A standard tub alcove is often wide enough for a shower base, though the drain location and the floor framing decide what fits. The work means taking out the tub and surround, adjusting the drain, waterproofing the walls and then tiling or installing a new surround. We'll look at it in person, and tell you if part of the plumbing needs a licensed plumber.

We'd like to update our Ajax kitchen in stages instead of all at once. Does that work?

It can. A sensible order is anything behind the walls first, then the cabinets or cabinet painting, then counters, then the backsplash and fixtures. Doing it in stages usually costs a bit more overall than one project, because some setup gets repeated, but it spreads out the spending. We'll price each stage separately in the written estimate so you can plan around it.

Need home renovations in Ajax?

Call or text Pedro, or ask for a free written estimate online.

Call Now Free Estimate